Teesta- V Hydro Power Project in Sikkim

  • Energy
Registered: VCS (V766)

The implementing agency for the project is National Hydroelectric Power Corporation Limited (henceforth referred as NHPC) which is a Government of India enterprise. The Teesta HE project – Stage V is a run of the river scheme and will be producing 2572.67 MU of energy that will be absorbed into the Eastern region, connected to the NEWNE grid. Stage V of the Teesta river project has installed a capacity of 510 MW (3×170 MW turbines). The power house is located near Singtam (about 4 km upstream of the confluence of Rongnichu with Teesta). The dependable discharge available throughout the year has been assessed as 60 cumecs and gross head available is 216.73 m; installed capacity of 510 MW. The project consists of concrete gravity dam across river Teesta with a 15 km long head race tunnel and an underground power housing three generating units of 170 MW capacity each. The energy generation at 90% dependable year and 95% machine availability is 2572.67 million kWh.

Show More Show Less

Recent project blog posts

No posts

Carbon credits

Year Type Quantity
2023 Issuance 0
2023 Retirement 338,919
2022 Issuance 600,000
2022 Retirement 1,718,270
2021 Issuance 3,150,000
2021 Retirement 1,029,852
2020 Issuance 0
2020 Retirement 96,112
2019 Issuance 0
2019 Retirement 83,925
2018 Issuance 0
2018 Retirement 139,897
2017 Issuance 0
2017 Retirement 1,489
2016 Issuance 0
2016 Retirement 12,603
2015 Issuance 0
2015 Retirement 121,801
2014 Issuance 5,600
2014 Retirement 109,731
2013 Issuance 37,000
2013 Retirement 401,715
2012 Issuance 1,274,000
2012 Retirement 7,628
Display type: