The implementing agency for the project is National Hydroelectric Power Corporation Limited (henceforth referred as NHPC) which is a Government of India enterprise. The Teesta HE project – Stage V is a run of the river scheme and will be producing 2572.67 MU of energy that will be absorbed into the Eastern region, connected to the NEWNE grid. Stage V of the Teesta river project has installed a capacity of 510 MW (3×170 MW turbines). The power house is located near Singtam (about 4 km upstream of the confluence of Rongnichu with Teesta). The dependable discharge available throughout the year has been assessed as 60 cumecs and gross head available is 216.73 m; installed capacity of 510 MW. The project consists of concrete gravity dam across river Teesta with a 15 km long head race tunnel and an underground power housing three generating units of 170 MW capacity each. The energy generation at 90% dependable year and 95% machine availability is 2572.67 million kWh.
Recent project blog posts
No posts
Carbon credits
Year | Type | Quantity |
---|---|---|
2023 | Issuance | 0 |
2023 | Retirement | 338,919 |
2022 | Issuance | 600,000 |
2022 | Retirement | 1,718,270 |
2021 | Issuance | 3,150,000 |
2021 | Retirement | 1,029,852 |
2020 | Issuance | 0 |
2020 | Retirement | 96,112 |
2019 | Issuance | 0 |
2019 | Retirement | 83,925 |
2018 | Issuance | 0 |
2018 | Retirement | 139,897 |
2017 | Issuance | 0 |
2017 | Retirement | 1,489 |
2016 | Issuance | 0 |
2016 | Retirement | 12,603 |
2015 | Issuance | 0 |
2015 | Retirement | 121,801 |
2014 | Issuance | 5,600 |
2014 | Retirement | 109,731 |
2013 | Issuance | 37,000 |
2013 | Retirement | 401,715 |
2012 | Issuance | 1,274,000 |
2012 | Retirement | 7,628 |