Sichuan Furong Coal Mine Methane Utilization Project (hereinafter referred to as the ¡°project¡±) will be implemented by the Sichuan Furong Group¡¯s Limited Industrial Company (hereinafter referred to as ¡°Furong Group¡±). The project is located in Yibin city in Sichuan Province, China. The primary objective of the project is to capture and use coal mine methane (¡°CMM¡±) for power generation. This will displace electricity used from the on-site captive power plant and the Central China Power Grid (¡°CCPG¡±) for on-site use. Currently, for safety reasons, CMM is extracted from four of Furong Group¡¯s mines, including Baijiao, Shanmushu, Xunchang and Gongquan coal mines. There is a small portion of residential and commercial use of the extracted CMM in the baseline scenario. The remaining CMM is released directly into the atmosphere. The implementation of the project will not reduce or affect the baseline level of CMM combusted for thermal demand

Show More Show Less

Recent project blog posts

No posts

Carbon credits

Year Type Quantity
2023 Issuance 10,000
2023 Retirement 204,403
2022 Issuance 2,348,127
2022 Retirement 414,462
2021 Issuance 0
2021 Retirement 95,080
2020 Issuance 0
2020 Retirement 44,720
2019 Issuance 0
2019 Retirement 129,252
2018 Issuance 0
2018 Retirement 2,034
2017 Issuance 434,379
2017 Retirement 0