Reducing Gas Leakages Within the Titas Gas Distribution Network in Bangladesh Verra
- Industry
Registered:
VCS
(V2930)
The project activity will reduce natural gas leakage in the distribution network of Titas Gas through the implementation of advanced leak detection and repairs (LDAR) procedures. The project activities will include inspection and leak measurements, as well as repair works at components in the natural gas above ground distribution system. using advanced leak detection and measurement technology including HiFlow Samplers. Leak Measurement Devices and Gas Surveyors as well as advanced repair materials. In addition, selected staff of Titas Gas will be trained in advanced leak detection, measurement, and repair techniques.
Recent project blog posts
No posts
Carbon credits
Year | Type | Quantity |
---|---|---|
2022 | Issuance | 4,137,966 |